Your search returned 11 results.

Sort
Results
Discounted Cash Flow by
  • Wright, Maurice Gordon [author]
Edition: 2nd
Material type: Text Text
Language: English
Publication details: London : McGraw-Hill, c1973
Online access:
Availability: Items available for loan: Circulation Section (1)Location, call number: Circulation Section 658.152 WRI.
Financial Analysis and Decision Making Tools and Techniques to Solve Financial Problems and Make Effective Business Decisions by
  • Vance, David E [author]
Material type: Text Text
Language: English
Publication details: New York : McGraw-Hill, c2003
Online access:
Availability: Items available for loan: Reference Section (1)Location, call number: Reference Section 658.151 VAN.
Case Fatima Fertilizer Company limited Valuation and Sensitivity Analysis by
  • Tauseef, Sana
Source: Busines Review: Leadership and Ideas for Tomorrow
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
An Economic Analysis of Potential Cost Savings fromUse of Low Voltage Dc (Lvdv)Distribution Network by
  • Hur, Don
  • Baldick, Ross
Source: Journal of Electrical Engineering and Technology
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Determinants of Firm Affiliation to Pyramid Structure: a Survey from Malaysian Public listed Firms by
  • Malan, Irfah Najihah Basir
  • Salamudin, Norhana
  • Ahmad, Noryati
Source: Journal of Asian Scientific Research
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Two-Stage Profit Optimization Model for linear Scheduling Problems Considering Cash Flow by
  • liu, Shu-Shun
  • Wang, Chang-Jung
Source: Construction Management and Economics
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Heuristic Method for Multi-Project Finance-Based by
  • Elazouni, Ashraf
Source: Construction Management and Economics
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Remedial Measures to Eradicate Delay DuringExecution of Construction Projects in Pakistani Perspective by
  • Memon, Ayaz Ahmed
  • Memon, Zubair Ahmed
Source: Journal of Engineering and Applied Sciences
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Methodology for Dtermining Prize Variation in Project Excecution by
  • Akpan, Edem
  • Iqwe, Odinaka
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Economic Analysis of Inventory System for Deteriorating Items with Shortages and A Finite Planning Horizon by
  • Chung, Kun-Jen
  • Liu, Joseph
Source: Proceedings ofNational Science Council, Republic of China
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Pages