Your search returned 5 results.

Sort
Results
Optimal Periodical Time for Preventive Replacement Based on a Cumulative Repair-Cost limit and Random Lead Time by
  • Chien, Yu-Hung
  • Chang, C. C
  • Sheu, Shey-Huei
Source: Journal of Risk and Reliability: Proceedings OfI Mech E Part-O
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Economic Design OfIntegrated Multivariate Epc and Multivariate Spc Charts by
  • Yang, ling
  • Sheu, Shey-Huei
Source: Quality and Reliability Engineering International
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Optimal Age-Replacement Policy with Age-Dependent Minimal-Repair and Random-Leadtime by
  • Sheu, Shey-Huei
  • Griffith, Wililams S
Source: IEEE Transactions on Reliability
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Optimum Policies for A System with General Imperfect Maintenance by
  • Sheu, Shey-Huei
  • Lin, Yuh-Bin
Source: Reliability Engineering and System Safety
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
The Generally Weighted Moving Average Control Chart for MonitoringProcess Median by
  • Sheu, Shey-Huei
  • Yang, Ling
Source: Quality Engineering
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Pages