Your search returned 2 results.

Sort
Results
Optimal Periodical Time for Preventive Replacement Based on a Cumulative Repair-Cost limit and Random Lead Time by
  • Chien, Yu-Hung
  • Chang, C. C
  • Sheu, Shey-Huei
Source: Journal of Risk and Reliability: Proceedings OfI Mech E Part-O
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Renewing Warranty and Preventive Maintenance for Products with Failure Penalty Post-Warranty by
  • Chen, Jih-An
  • Chien, Yu-Hung
Source: Quality and Reliability Engineering International
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Pages