Your search returned 2 results.

Sort
Results
Ex Post Project Risk Assessment: Method and Empirical Study by
  • Ma, Zihui
  • Erfani, Abdolmajid
  • Cui, Qingbin
  • Baecher, Gregory B
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Not available: Engr Abul Kalam Library: Available on Request (1).
Point-Estimate Method As Numericla Quadrature. by
  • Christian, Thon T
  • Baecher, Gregory B
Source: Asce: Journal of Geotechnical and Geoenvironmental Engineering
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Pages