Your search returned 12 results.

Sort
Results
Analysis of Cost and Schedule Performance of International Development Projects by
  • Gunawan, Indra
  • Ahsan, Kamrul
Source: International Journal of Project Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Flexible Model for Time/Cost Tradeoff Problem by
  • Moussourakis, John
  • Haksever, Cengiz
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Potential of total Cycle Time Compression in Construction: Focus on Program Development and Design by
  • Barker, Ralph
  • Childerhouse, Paul
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Applying A Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization by
  • Ng, T. S
  • Kumaraswamy, Mohan M
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Distributed Scheduling Model for Infrastructure Networks by
  • Hegazy, Tarek
  • Elhakeem, Ahmedk
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Distributed Scheduling Model for Infrastructure Networks by
  • Hegazy, Tarek
  • Elhakeem, Ahmedk
  • Elbeltagi, Emad
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Applying A Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization by
  • Zheng, Daisy X M
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Potential of total Cycle Time Compression in Construction: Focus on Program Development and Design by
  • Barker, Ralph
  • Naimi, M
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Estimating Future Highway Construction Costs by
  • Wilmot, C G
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Probabilistic Model for Cost Contingency by
  • touran, Ali
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Indicator Variables Model of Film'S Size-Profitability Relationship of Electrical Contractors Using Financial and Economic Data by
  • Ammar, Abdurahman
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Predicting Accuracy of Early Cost Estimates Using Factor Analysis and Multivariate Regression by
  • Trost, Steven M
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Pages