Your search returned 6 results.

Sort
Results
Hold-Ups and Failures in Negotiated Order: Unearthing Nuances of Rework Causation in Construction by
  • Love, P.E.D
  • Matthews, J
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Not available: Engr Abul Kalam Library: Available on Request (1).
DemystifyingFolklore OfAccidental Project Manager InPublic Sector by
  • Love, P.E.D
  • Baccarini, David
  • Darreli, Vanessa
Source: Project Management Journal
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Establishment of Critical Success Factor for Construction Partnering. by
  • Cheng, Eddie W.L
  • Li, Heng
  • Love, P.E.D
Source: Asce: Journal of Management in Engineering
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Using Machine Learningandgato Solve Time Cost Trade -off Problems. by
  • Li, Heng
  • Cao, J. -N
  • Love, P.E.D
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Ann-Based Mark-Up Estimation System with Self-Explanatory Capacities. by
  • Li, H
  • Shen, L.Y
  • Love, P.E.D
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Optimal Allocationofconstructionplanning Resources. by
  • Faniran, Olusegun O
  • Love, P.E.D
  • Li, Heng
Source: Journal of Construction Engineering and Management
Material type: Article Article; Format: print
Availability: Items available for loan: Engr Abul Kalam Library (1).
Pages