Project Schedule Acceleration Optimization Integrated with Energy Source–Based Assessment of Occupational Health and Safety Risks (Record no. 814974)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02028aab a2200205 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 240216b20232023|||mr||| |||| 00| 0 eng d |
022 ## - INTERNATIONAL STANDARD SERIAL NUMBER | |
International Standard Serial Number | 0733-9364 |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Siddika, Ayesha |
9 (RLIN) | 880874 |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Lu, Ming |
9 (RLIN) | 754705 |
245 ## - TITLE STATEMENT | |
Title | Project Schedule Acceleration Optimization Integrated with Energy Source–Based Assessment of Occupational Health and Safety Risks |
300 ## - PHYSICAL DESCRIPTION | |
Extent | 1-12 p. |
520 ## - SUMMARY, ETC. | |
Summary, etc. | This research devises a risk indexing method to assess the occupational health and safety (OHS) hazards associated with major sources of energy in the construction field, providing numerical inputs to project plan and schedule optimization. Further, the problem of “minimizing project schedule at lowest safety risks” (MPSLSR) is formalized to incorporate the concept of energy sources for OHS management in project planning and scheduling optimization. Instead of following commonly applied techniques to solve multiobjective optimization problems, the proposed research takes an alternative two-step approach to minimizing project duration and risk index, based on interpretation of path float in connection with the critical path method. This results in optimized project schedules that mitigate the substantial increment of OHS-related risks due to accelerating construction progress on projects through avoiding the incurrences of unnecessary activity time crashing and associated increases in OHS-related risks. The research application is demonstrated with (1) a tunnel construction project and (2) a made-up project featuring a large, complex network model. |
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | Energy Source-Based Assessment |
9 (RLIN) | 880875 |
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | Occupational Health |
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | Safety Risks |
9 (RLIN) | 880876 |
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | Acceleration Optimization Integrated |
9 (RLIN) | 880877 |
773 0# - HOST ITEM ENTRY | |
Place, publisher, and date of publication | Reston,Virginia, U.S.A : American Society of Civil Engineers/ American Concrete Institute |
Title | ASCE: Journal of Construction Engineering and Management |
International Standard Serial Number | 07339364 |
856 ## - ELECTRONIC LOCATION AND ACCESS | |
Uniform Resource Identifier | <a href="https://doi.org/10.1061/JCEMD4.COENG-13615">https://doi.org/10.1061/JCEMD4.COENG-13615</a> |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Source of classification or shelving scheme | Dewey Decimal Classification |
Suppress in OPAC | No |
Koha item type | Articles |
-- | 14993 |
-- | Mr. Muhammad Rafique Al Haj Rajab Ali (Late) |
Not for loan | Home library | Serial Enumeration / chronology | Total Checkouts | Date last seen | Koha item type |
---|---|---|---|---|---|
Periodical Section | Vol.149, No.12 (December 2023) | 16/02/2024 | Articles |