Realizing a Quick Partial BIM Update of Subgrade in Railway Stations (Record no. 814287)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 01998aab a2200253 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 231016b20232023|||mr||| |||| 00| 0 eng d |
022 ## - INTERNATIONAL STANDARD SERIAL NUMBER | |
International Standard Serial Number | 0733-9364 |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Pu, Hao |
9 (RLIN) | 878701 |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Fan, Xiaomeng |
9 (RLIN) | 878702 |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Li, Wei. |
9 (RLIN) | 168982 |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Zhang, Wei. |
9 (RLIN) | 171243 |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Schonfeld, Paul |
9 (RLIN) | 803573 |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Wei, Fanghua. |
9 (RLIN) | 878703 |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Xu, Zhanjun |
9 (RLIN) | 878704 |
245 ## - TITLE STATEMENT | |
Title | Realizing a Quick Partial BIM Update of Subgrade in Railway Stations |
300 ## - PHYSICAL DESCRIPTION | |
Extent | 1-17 p. |
520 ## - SUMMARY, ETC. | |
Summary, etc. | A railway station subgrade (RSS) is a complex earth structure for supporting various railway facilities and its building information modeling (BIM) is an essential task in a railway station project. During the entire life cycle of an RSS BIM model, it will be frequently updated according to the progress of the project. However, the current way of updating an RSS model is commonly conducted in a complete rebuild, which is very inefficient and time-consuming. To address this issue, we propose a novel approach for realizing a partial BIM update driven by model changes, through which a quick update for an existing RSS BIM model can be achieved. A partial updating strategy that is triggered by a model change is developed to locate a minimum influenced domain of the original model and update it in that domain. An actual railway station case is used for demonstrating the validity of the approach, through which a quick partial update to an existing RSS model is achieved by skipping the redundant computations in the process of a complete rebuild. |
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | Building Information Modeling (BIM) |
9 (RLIN) | 878452 |
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | Partial BIM Update |
9 (RLIN) | 878705 |
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | Railway Station Subgrade (RSS) |
9 (RLIN) | 878706 |
773 0# - HOST ITEM ENTRY | |
Place, publisher, and date of publication | Reston,Virginia, U.S.A : American Society of Civil Engineers/ American Concrete Institute |
Title | ASCE: Journal of Construction Engineering and Management |
International Standard Serial Number | 07339364 |
856 ## - ELECTRONIC LOCATION AND ACCESS | |
Uniform Resource Identifier | <a href="https://doi.org/10.1061/JCEMD4.COENG-13359">https://doi.org/10.1061/JCEMD4.COENG-13359</a> |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Source of classification or shelving scheme | Dewey Decimal Classification |
Suppress in OPAC | No |
Koha item type | Articles |
-- | 14993 |
-- | Mr. Muhammad Rafique Al Haj Rajab Ali (Late) |
Not for loan | Home library | Serial Enumeration / chronology | Total Checkouts | Date last seen | Koha item type |
---|---|---|---|---|---|
Periodical Section | Vol. 149, No.9 (September 2023) | 16/10/2023 | Articles |